House update: getting ready for concrete

We are scheduled for our slab pour in just two days! (“Lord willing and the creek don’t rise.”)

Its been a lot of hard work getting to this point where we are ready to pour (and there’s still some work to be done tomorrow.)

When I last updated, we had just started cutting the trenches for the plumbing and footers.

This looks like a complete disaster, but there really is some order to it.

This is the same area later that same day.

We put a call for help out on Facebook and a bunch of our extended family showed up to help with the shoveling.

Even Flower Girl was a huge help!

My brother manning the sifting station.

My sis-in-law lugging some buckets of dirt out of the forms.

We were able to dig nice and neat trenches for the interior footers.

Once we got the trenches all dug and cleaned out, it was time to start on the drain piping.

ABS fittings

Our first completed branch line dry-fitted.

Once we had all the pipes laid out where and how they needed to go, we had a few days wait for our retired contractor friend to stop by and let us know how we did. He made a few suggestions which we followed.

While we waited for him, we made a good start on our septic system.

When we got the go ahead from our friend, we started gluing all the drain pipes and fittings together.

And bedding all the pipes in sand.

The girls had fun talking to each other through the pipes.

Then we had to test the system. This involved capping off all the pipes except this really tall one, then filling the whole system with water.

We only had the backhoe for a limited amount of time, so we got as much done with it as we could. Such as getting the water line put in across the driveway.

This line will eventually connect to an underground cistern which we will fill from our well pump.

I let Princess Girl try her hand at moving the backhoe around (with me right next to her, of course.)

We passed our under-slab plumbing inspection, and it was time to start backfilling. Again.

This time we needed to use sand to completely cover the pipes.

A good friend came by to lend a hand.

Flower Girl love playing in the sand.

She also found a way to go sledding in September. 😄

Once we had the sand over the pipes, we switched to using type 2 base and we were back to filling and compacting.

Once the pad was fully backfilled, there was just once last project to do with the backhoe before we had to turn it back in to the rental company. We needed to cut our footers for our garage and the trench across the drive to run electrical lines.

Then it was time for rebar!

Over the next several days we worked to get all the rebar finished in time for our inspection. We hit a couple delays, but managed to git ‘er done.

And that brings us up to our current situation. We had our inspection on Monday and passed with flying colors. Our concrete contractor was booked up till Friday, so that’s when we’re scheduled. We still have a couple odds and ends to take care of before we pour on Friday, so we’ll be taking care of those tomorrow.

So, Lord willing, we’ll have a finished slab by Friday evening! And let me tell you, it’s none too soon. The temps are dropping and freezing weather is just around the corner.

We’ve worked hard, but it’s exciting to see the progress. Hopefully when I update next the slab will be done!

This entry was posted in Building a Home and tagged , , , , , , , , , on by .

About Maridy

Hi, I'm Maridy. I have many interests in life. Right now, my husband and I and our two girls (ages 14 and 7), along with a couple of dogs currently live in a 33ft trailer while we build our house on our homestead property in Northern Nevada (Castle Rock Homestead). Follow us on that journey to building our high desert homestead from the ground up! I also have a passion for hiking and have a blog for that, too. (Journey in the Wilderness) Join me there as I explore the beautiful outdoor landscapes of Northwestern Nevada and Eastern California. And finally, I love historical costuming. Though I haven't been able to do much of that in recent years, I'm hoping that "once the house is built" I'll be able to get back into it more. See what all we've done with that on my Yesteryear Productions blog.

2 thoughts on “House update: getting ready for concrete

  1. Vickie

    Oh my goodness, this is so cool! I am jealous that you were able to do your own plumbing! You saved thousands of dollars doing it yourself. We are paying out the nose!. We could only find one plumber that still does rough plumbing, and he is going to install about $750 worth of plumbing for $12,000!!!! Anyway, your build site looks great! It won’t be long before you get your walls and roof up for the winter. That picture of flower girl talking into the pipes is so cute! Good luck on the pour!

    Like

    Reply
    1. Maridy Post author

      Thanks Vickie. It was actually postponed till Monday. But that’s ok with us. Better chance of not freezing. That’s crazy about the plumbing contractor. Is that for ALL the plumbing or just the under floor stuff? Glad to know that the two grueling days I spent reading the International Residential Building Codes saved us so much money!

      Like

      Reply

Whaddya think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s