The Great Potato Experiment of 2019: Day 29

Edit: I wrote his post at the end of May. I found it in my drafts in August! I am backdating the publishing date so hopefully it will show up on the blog in order, but for all my subscribers who will get an email notification about it, that’s the reason why it’s old news. 😊

Last week, on Day 29, the potato plants had grown enough that I “hilled” them up. Essentially, I just pulled in that dirt I moved to the side when I planted them. I forgot to take any pictures except for the ones in the pots.

So I was all excited that this seems to be working so beautifully, when I came across a fact that had me pondering if my potatoes are going to do as well as I had hoped.

Basically, did you know that there are two types of potatoes: determinate and indeterminate? And that you plant them differently and treat them differently according to which kind they are?

I had no idea! I thought a potato was a potato when it came to planting and I hadn’t ever even heard of any method of planting and caring for them other than variations of the hilling method.

But I was wrong. The hilling method, where you keep adding soil or mulch as the plant grows and more and more potatoes will grow in the new areas you buried, only works for the indeterminate varieties. I’m not sure what kinds are those varieties, but I can tell you which ones they are not! Red Norland, and Purple Majesty!

Yep, the two varieties I planted are determinate, which means that they will only ever set potatoes in the first layer of soil where they are planted.

Awe well, learn something new every day. I still have hopes that they will grow and give us at least a few potatoes.

The Great Potato Experiment of 2019: Days 10 and 15

They are growing!

May 12: Day 10

The first little sprout started looking it’s head through the soil.

I was starting to get a little worried. No signs of life. Would they actually grow from those sprouts I planted or were they too far gone? Had they expended too much energy already just trying to get out of the box and then been shocked by being smothered in the ground?

Well, at least one is growing, so I’m happy.

May 17: Day 15

More growth!

The main bed showing the red potato spouts showing through the soil.

A purple potato sprout. I love that even the leaves start out purple, my favorite color.

I had a couple of the red seed potatoes that didn’t fit into the main bed, so I planted them in some old pots I had. They are growing, too!

I am loving this “experiment”. Not only am I trying something that is essentially new to me, but as I walk through my terraced beds every day to work on the house, I am filled with joy that I have a garden this year.

Yes, it’s tiny and not even fully planted yet, but it’s there. And seeing all the new growth fills a spot in my soul that reminds me how much I love gardening and producing our own food.

Soon I’ll have to share my tomato experiment of this year. 😯

House update: miscellaneous jobs

You know when you have that big project on the horizon that you need/want to start working on, but for whatever reason you can’t yet but there’s a long list of projects to do so you gotta get them taken care of and when you finally do them you realize it actually feels good to be able to cross something off the list and you wonder why you procrastinated so long because, I mean, you’re not working on the “big project” right now anyway?

*Takes a deep breath after that extremely long run-on sentence.* 😉

Yeah, we’ve crossed quite a few need-to-do little projects off the list in the last couple of months since getting the septic finished. Some of them so small, I didn’t even bother to take pictures. But some of them were significant enough that they have made our life so much easier.

Like our garden hose hydrant. We dug a trench (more trenching!) from where our water line crosses the driveway over to where we wanted the hose faucet next to the landscaping rocks.

The trench.

Tee into the water main

Princess Girl got in on the action

The gravel in the bottom of the pit is to aid in drainage since this is a frost-free hydrant. That means that every time the water is shut off, the water that is in the top of the pipe drains out of a small hole at the bottom of the trench so there is no water up in the pipe or faucet to freeze in the winter. We did put in a shut-off valve just in case we ever need to shut the water off to the faucet for any reason, but theoretically, we shouldn’t ever have to use it.

We have water!

And it works like a charm! And made our water situation around here so much easier! Watering the gardens were a breeze with 1700 gallons on tap. Yep, that’s how big our cistern is. We fill it up from the well as needed (every couple of weeks at the end of summer) and it supplies all our outdoor and animal watering needs. Right now it is mid-November and we haven’t gotten any moisture all season long. Great for working outside, not so great for our fruit trees and perennial plants. So we’re still having to water the trees and gardens every once in a while. This hydrant also makes it super easy to re-fill our rain barrels (because, you know, no rain). We use the water in the rain barrels for the animals. Before having the hydrant, we would have to turn on the big generator and well in order to fill barrels, etc. Now, with 1700 gallons of water at our disposal, we only need to fire up the genny and well pump every…actually, we don’t know how long it will take us to go through that much water this time of year. Suffice to say, it will take a while. And since it’s all under ground, it won’t freeze during the winter. Yay!

Another project we were able to check off the list was to move the electrical conduit for the garage. We hired out having the garage built, and we ended up needed to scoot the whole building back a few feet, which means the place where we originally had the conduit coming up was no longer in the correct spot.

New perimeter lines drawn

You can see in the pic above that the conduit was now several feet away from the wall of the garage. So, once the construction crew dug the footers, we came in and extended the conduit so it comes up inside the garage near the wall where our solar power system will be installed.

Electrical conduit extended

Again, not a huge job, but it HAD to get done.

Another small job that made our life so much easier was installing shop lights in the house.

Let there be light!

Now that the days are shorter, we needed light in the house so we can keep on working after the sun goes down.

And speaking of the days being shorter, and therefore colder, we finally got our laundry room door ordered and then installed.

A real door!

We could have had this door in place since January since it’s frame is part of the steel building, not the interior wood frame like all the other doors will be. But last winter and spring we were on hold with the house and the house only had this one wall anyway. And over the summer it wasn’t needed because of the weather. It was only when it got cold enough that we needed to stop the breeze from blowing through the house that we got our butts in gear and got it done.

And yet another small job we got done recently was replacing the rain gutter on our mud room. We had scabbed together something when we first built it, but after two winters it needed to be replaced. So we got a real gutter system. And now we’re set for this winter. And hopefully we’ll get a lot of rain and snow this year. We need it!

Princess Girl is learning all sorts of skills living here on the homestead.

So much nicer than the old system.

And that’s about it for now. As I said, there were plenty of other odd jobs done that I just didn’t document. And in the middle of all that, there was one major project that we worked on over the course of a couple weeks…

The floors!

But that’s a post all on its own. For now I am going to sign off.

I gots things to do!

House update: Septic Phase 2

Finally, I feel like we’re making progress! In fact, I have so much to share, I’m putting it in several blog posts to keep it all straight. 😁

So, last I left off, we we’re just starting on our leach field. I naively stated that “by the end of the week” we hoped to have a completed system.

Ha!

It wasn’t that was hit any unexpected problems. It was more that the problems we did face we’re harder to overcome than we expected. Namely, we had no dirt with which to backfill the leach lines. It was mostly just rocks. So, we had to purchase and haul in dirt. Again.

But I’m getting ahead of myself.

First thing we had to do was dig the trench for the sewer pipe from the already buried septic tank, down the hill to where the leach lines were going to go.

Blessedly, Pops was on hand to dig once more.

My mom came to help, too!

We only ran into one huge Boulder which we just couldn’t budge with the small excavator we rented. But, a friend had a jackhammer that worked to get the boulder out of the way.

Our excavation crew. We are blessed with great friends who come to help us out.

Completed pipe from the septic tank down to the distribution box.

While we were working on the pipe, Pops was digging the trenches for the leach chambers. So once we got the pipe laid, it was time to bring down the chambers and start laying those.

We chose this system because the trenches only need to be 3 feet deep and no gravel is needed. And it’s very easy to put together. And handle. And transport. Etc, etc, etc.

Pajii finds a bit of shade inside a septic chamber 🤣

Leveling the ground in preparation for another chamber.

Making sure the previous chamber is level.

Prepping the ground for yet another chamber.

Once the chamber is in place, dirt is shoveled in on the sides to hold it in place. That’s where we ran into issues. We had trouble finding enough rock-free dirt to cover the chambers.

Digging the third and final trench.

Sometimes, the big tools had to come out to make the chambers level.

Pajii once again inside one of the septic chambers. 🤣

Each leach line was 80 feet long.

We got all three lines laid and partially buried, then had our inspection. Which we passed, no problem!

Here you see the leach field in relation to the house. What you can’t tell is just how steep that hill is.

Now it was time to backfill.

But again, how to get the backfill material from the trailer to the pipe when you’re dealing with steep, rocky terrain?

Buckets. Lots and lots (and lots and lots) of buckets full of sand.

If I never have to move sand by bucket again, I’ll be happy. 😉

Once we had a good layer of sand on top of the chamber, we could then push the native dirt (full of rocks) back over the top.

Goofball!

The hubby and I got real good at handling the mini-ex.

Aaaaand we’re done!

And that’s it. A completed septic system. It felt so good to know that we have another huge portion of our build completely done.

So now we have a fully functional septic system. But of course, nothing is hooked up to it. We have dumped the trailer sewer tanks in there a couple times since it’s been done, and that’s been great. Not having to go into town to empty those is a blessing indeed.

But let me tell you, that first toilet flush in our new house is going to be magical.

Once we finished the septic system, we turned our focus to the inside of the house. Primarily, the floors. But that is another post. I want to get this one sent off into cyber space and get back to working on the house rather than writing about it.

Wild places

Rocks and trees, slides and swings, bugs and critters: our homestead playspaces are not soft places.

The other day as I was fixing up our slide for the kids, it hit me that many of today’s parents would take one look at it and shoo their children to something more safe. Maybe the sandbox.

Surrounded by rocks, no soft edges in sight.

Eventually, the terraces will be cleaned up and built up and beautified, but the rocks will still be there. The “danger” will still be there.

Our swings are attached to one of the very few suitable trees near the house, but they are not in an ideal location.

Our property is a wild place.

And it got me thinking. We are not a bubble wrap homestead. Or property is a wild place.

A place where kids can roam. Explore. Be free.

There are trees to climb, rocks to scale, bugs to find, and dirt to get into every nook and cranny.

And I love that about living in the country.

Kids learn to navigate the physical world with confidence when they are allowed to do so. Climbing high in trees, balancing on top of huge boulders, helps them learn balance and coordination. They learn what their body can, and can’t, do.

Sure, every once in a while, there’s bumps, bruises, and scrapes. There may even be a broken bone or two in our future. But bruises and scrapes and even broken bones heal. And you know what the truth is? Accidents and injuries happen even if you live in a bubble wrap world. Flower Girl broke her leg just by falling off the couch. And Princess Girl badly sprained her ankle just by walking down the stairs.

And so, we let our children run and play and explore and they are happy and healthy.

Homestead update: not a lot of progress in the last two months

So, last I wrote about the house, we were still waiting on contractors to come finish the siding and roof. Our house sat with only 1½ walls for 4 months till the new contractors finally fit us into their schedule. They finally started and I jumped in to help on a particularly windy day. In the process of helping, I learned how to do it.

So when some unavoidable delays happened again, we decided to take matters into our own hands.

Brushing off the dirt from the panels

And there were were, a family of rock stars who put the preliminary insulation, and siding up on 1½ of our walls, all by ourselves.

But then…

Before the contractors could come back and start on the roof, there was some trim work that needed to be done. And we REALLY wanted that roof. So, we continued working sun up to sun down in a push to get ready for the contractors.

With the help of some good friends

This picture makes me so happy. I love that my girl is old enough to be a huge help, but also to really remember this awesome adventure we get to have as a family.

We got the trim all on and it was time for the roof.

But first…

Yep, that’s a fire pit. INSIDE our house. How many of you can say you’ve done that?

And then the day finally came that the roof started going on!

Oh Happy day!

Pajii got to help!

Finally! The roof was on, but there was still a bit of trim work to do before we no longer had the equipment. So once again, my brother and sis-in-law jumped in to help out.

And then it was done, done!

We still have to cut in the doors and windows, but at least it’s “dried in”.

So the exterior structure of our house was done. And so was I!

This is what happens when you hurt your knee but don’t really take the time to slow down and heal. It keeps getting worse until it’s so bad you can’t walk on it any more!

So, I was laid up for about a week, waiting for my knee to heal well enough that I could get back to work.

But in the meantime, we had one more job to do with that equipment.

Putting in our cistern tank.

But let me back up…

Last summer, we needed to rent a large excavator to widen our garage pad. We also dug the hole and trench for our cistern system (say that three times fast!). A cistern is a fancy way of saying a water tank. This one is specifically a holding tank that we will fill with our well water and use as the water for our house. Being off grid, this is the best system.

But in order to get the tank in the hole, we needed to prep the hole and run the line for the water.

Remember the part I said the hole and trench were dug last year?

Yeah, it wasn’t pretty. And this picture is after Pajii had cleared all the big rocks out! But that entire trench had to be bedded in sand for the pipe to lay on. And how do you get dirt up a 175 foot long trench that is 3+ feet deep and only 2 feet wide?

With buckets. Lots and lots (and lots and lots) of buckets full of sand! In fact, that’s how I hurt my knee, all the way back at the beginning of June. Carrying those heavy buckets (each one weighs roughly 40lbs when full!)

And where were we getting the sand for most of the job?

From our own sand pit, of course. We bedded and covered nearly a hundred feet of pipe on a very steep hillside by “mining” sand from our property. A lot of extra work, but it was free, and we had the time (we were still waiting for the contractors at the point.)

So fast forward several weeks. The contractors came and went and we had abandoned the trench prep in lieu of working on the house (because, priorities), I had begun to heal from my knee injury, and we were looking forward to finishing the cistern and starting the next phase of the journey.

But that was not God’s plan. My Dad’s health took a drastic turn for the worse and it became apparent that he should no longer be living alone, and therefore, his house on the other end of town needed to be sold. So, very reminiscent of when we dropped everything and moved to Oregon in 2014 to care for Hub’s ailing mom, we dropped nearly everything to care for my ailing dad and get his house ready to sell.

That was at the end of June. It took two months, but I’m happy to say, PopPop is now settled in here with us (in his own trailer), his house is in escrow, and we only have one more load to bring home from his house.

But in the midst of all that, we needed to finish the cistern. And we needed to do it quick. We had already put in so much work to it, that to leave it at the mercy of the elements was just stupid. So, while we still had the equipment we used for the siding on the house, we put in the cistern. Then we had to bring in load after load of DG (saving us the time and effort of shoveling it from our own property). But, how do you get the DG from the trailer on the road, down 15+ feet to the hole that the cistern is in?

That’s right, some of our roofing and siding scraps. The sand just slid right in. Quite ingenious, if I do say so myself.

And so easy, a 5 year old could do it.

Then it was another while before we could get it finished. That entailed hooking up the supply pipes, etc to the tank.

Hubs is inside the tank, putting holes in it!

Starting to fill in the hole to cover the tank

And that brings us up pretty much to the present. Here’s an updated picture of the dianthus bush I planted.

The dianthus has not done too well in our hot summer, but the alyssum, petunias, zinnias, and marigolds that I planted around it have just about taken over!

And we’ve got another broody hen who has been sitting on golf balls for 5 days. I put 9 fertile eggs under her this evening. This will be hen #6 that we’ve tried to get to set till the eggs hatch. It has been misadventure after misadventure. But I’ve learned a lot and have great hopes that this clutch of eggs will be the one!

We did have two chicks hatch from our very first broody hen of the season.

I’m not sure why only two of the 7 eggs survived. Of those other 5 eggs, one chick was half hatched, three were fully formed as far as I could tell but had died before hatching, and one had gone rotten from the beginning of the brood. But I was totally excited to get two of our very own, completely home grown chicks! Too bad they both turned out to be boys. 🙄😒

And now, for the truly, truly up-to-date update:

We’ve started working on the Septic System: Phase 2! By the end of the week, we should have a complete septic system. Hallelujah!

Using a friend’s transit level to lay out the septic field.

The middle one of the three required leach lines marked out.

And today, we started cutting the trenches. But that’s another post for another time. Right now, I am t-i-r-e-d. And we still have at least another two hard days of work till we can call for inspection.

Nighty night. Don’t work too hard!

Landscaping

(Edit: 8/28/18 I wrote this post over three months ago. Today, while looking at my writing app, I see the little word “draft”. I had never published it! Silly me! So without further ado…)

Imagine your house (either the one you currently live in or one you have lived in at some point). Now imagine if all the land surrounding that house was bare ground. Now throw in a bagillion rocks, and a few weeds here and there for good measure. Not a pretty thought, is it? Kinda depressing?

That’s how I feel about the land immediately surrounding our house. Yes, it’s understandable since it is a construction zone. But that doesn’t make me any happier when I look at it.

So, while I was delayed on working on the actual house, I decided to do something about the landscaping.

When the house pad was cut, it left behind a fairly steep hill of barren, rocky soil. But in my mind’s eye, I see beautiful terraces, filled with edible and decorative plants that provide beauty and habitat all year long.

When we had the backhoe last fall, I did the rough (and I do mean rough) cut of the terraces. This spring I have slowly been building the terrace walls.

The stairs were built out of railroad timbers we had on the property. The rocks are all native to within 50 feet of right there!

I completed this triangular section first because that is going to be Pajii’s area and I wanted him to feel like he could plant if he wanted to. Besides, it was the easier section to do!

A friend of ours came by one afternoon to help out with stacking rocks.

The circled rock in the picture below was just one of several 100lb boulders I needed to dig out and move.

All of the whiteish rocks below it are the rocks I piled under it when I levered it up, until I could roll it out of the hole.

In the picture below you can see the completed terraces on the right of the steps, and the not-yet-started hillside to the left. The huge boulders were dug out of the hillside where our well is now. They were placed in such a way as to become part of the landscaping. There are several more that you can’t even see just to the left, and many more that got used as a retaining wall over by where our garage will go.

So I got a bit of the terraces done on the left side of the stairs, and while at the hardware store, succumbed to an impulse buy of a dianthus bush. I just loved the color of the flowers and the fact that they are supposed to bloom from spring all the way till fall!

So, I had to find a place to plant them.

The very first plantings in the terraces. 😄

I also decided to pick up a few more landscaping plants that I know I want. And as the saying goes, the best time to plant a tree was 40 years ago. But seeing as how I’m not (quite) even 40 years old yet, I figure the best time to plant is now.

Lilac

Red Haven peach tree

Double Delight tea rose 🌹

The first bloom on the rose bush

I also bought some annuals to plant in pots around our trailer to pretty things up a bit.

Our fruit trees that we planted last year are doing well. The cherry trees blossomed out in late April and I thought for sure they’d be killed by a frost.

Cherry blossoms with Mason bee 🐝 busy pollinating

And they almost were! We were surprised by a light frost at the very end of April. Not that it’s unusual to freeze that late, but all of the forecasts said we were going to stay above freezing that whole week. But everything seemed to be ok despite the freeze. The next night was supposed to get nearly as cold, so we decided to play it safe.

The apple trees wrapped against the cold look like weird lollipops.

Apple blossoms

Yesterday, I checked on the cherry trees, and lo and behold, they’re loaded!

And last but not least, we bought some native/locally adapted plants from the state nursery and will find places for them to go once the terraces are completed.

For now, we have been busy trying to finish up the septic system. But we’re almost done with that, then I again won’t have anything to do, so I will go back to the terraces.

Now, remember that house you thought about at the beginning of this post? Think of all the bushes and trees and flowers that actually do surround it. Are there any that you’ve ever thought, “If I had been in charge, I would not have planted that”?

Well, guess what. We are in charge of everything that gets planted here on our land. It’s actually rather exciting to be building our land from the ground up. While it is a lot (a lot) of hard work, it’s awesome to be able to make it how we want it and only have to deal with what nature handed us, not what other people thought was a good idea. And so far, with the exception of the dianthus, I’ve put quite a bit of thought into the plants I’ve chosen.

One day, it’s going to be beautiful!

House update: septic system, phase 1

We are STILL waiting on the contractor to come and finish siding and roofing the house. So in the meantime, we’ve been working on the septic system. I posted last time about how I was trying to find the strength and willpower to get started on that project. Well, I am happy to report that phase 1 is just about finished!

Phase 1 = hooking up the sewer system from the house to the septic tank.

Phase 2 = the sewer system from the septic tank to the leach field. We haven’t even started this phase yet. It requires renting an excavator, etc.

But we are feeling accomplished at the progress we have made. Especially since we’ve been doing all the backfill, etc by hand. No machines. It takes a while, but it doesn’t cost money.

Ok, well, technically we’ve had to buy DG (decomposed granite, which is a type of sand) to surround the septic tank, but other than that, it’s been free. In fact, we got some other fill dirt for just the price of gas to go get it.

We did get some help on the septic trench. My nephew and his wife came to town and we put them to work!

Actually, they wanted to help. And now whenever we get to use our toilet, we’ll be able to thank them for helping. 😁

We have a sand pit on the property that we were initially mining sand from to bed the septic pipe in.

And it was working just fine, but it was a very slow process as we could only get small amounts of sand at a time. But it allowed us to start the process. And as we all know, starting is half the battle.

My helper

Test fitting

Raising strong a woman

.

More sand, and another strong woman in the making

Not too long after the above pictures were taken, we decided we needed to move along a bit (or a lot) faster, so we decided to purchase sand to bed the pipe and surround the tank in.

Love, love, love Pajii’s dump trailer!

Gluing the pipe! It’s always an exciting time when you get to play- uh, I mean work, with glue!

I’d never worked with this particular type of sewer pipe before. It has a rubber gasket instead of using glue. It makes getting the pipes together a bit tricky. But ingenuity wins every time.

Once we got the pipe laid and inspected, and just before we started covering it, we took some measurements. This is very important if we ever have to dig that thing back up for any reason.

We passed the inspection with flying colors, and it was time for backfill!

But first…we had to clean out all the rocks and debris that had fallen in the pit over the winter. Oh, actually, we did that before the inspection. Forgot. Anyway, here we are cleaning up the pit.

Including this big rock. Waaay too big to get it out by hand.

Again, ingenuity to the rescue. We were able to use this system to get enough sand under it that we could roll it away from the tank and bury it.

Then it was sand, sand, sand.

And finally regular dirt on top.

And yes, that’s Princess Girl on crutches. She sprained her ankle. 😞

Filled in trench, which will eventually get another 1-2 feet of fill when we bring in dirt to raise the ground level up to slab level.

And an almost covered septic tank. We actually did even more after this picture was taken. It is now almost even with the top all the way around.

Right now as I write this post, I am down in town waiting for the trailer to be loaded with free fill dirt. I met a guy through Craiglist. He had good quality fill dirt he needed hauled away, and we have need of dirt we don’t have to pay for. Win-win.

We decided that we wanted to pay for only what we have to (because despite the saying, dirt ain’t cheap!), so we devised a system where we put the purchased DG sand in the first foot or so up against the tank, then outside of that, we put either our native soil, or this other fill dirt that is not as high a quality.

I’d say by the end of the week, the septic tank will be completely covered. Yay! That means we can finally bring in the needed dirt to raise the ground level all around the house up to what it’s supposed to be.

And that is just one step closer to done.

House update: nothing really to report

You know that saying, “Use it or lose it”?

Yeah, I think I lost it.

After a whole winter of sitting on my butt, one hour, just one hour of shoveling kicked that butt.

Last summer/fall I did great. I could work, work, work all day, and get up and do it again the next day. Sure, it was hard and I was tired, but I could do it. I was actually amazed at my stamina.

But a few months of sitting around just…waiting, and I am so out of shape!

In my defense, the dirt I was shoveling was wet clay. You ever tried shoveling wet clay?

Let’s just say there are extra challenges!

I’ll tell you what I was working on in just a sec, but first, a picture of the progress on our house. Our should I say LACK of progress?

Yep, looks exactly like it did the last time I posted about it. We are still waiting on contractors. But I won’t go into all that. Because I’m trying to keep a Christian attitude. 😒

So, what was I working on today? As tempting as it was to work on Pajii’s garden boxes some more, I decided to finally start finishing one of our half finished projects: our septic system.

We dug the septic line trench from the house to the septic tank last fall when we had the backhoe, but were not able to get the pipe laid before winter came.

So all winter long the trench has sat there, slowly filling in with dirt and rocks. I’ve been avoiding getting back in that trench this spring because, dirt work. I would much rather be building walls, etc inside the house. But, well, I can’t right now. So, since we have a couple days of good weather, I decided to stop being an avoider.

And since I really didn’t want to do it, I told myself I only had to work on it for one hour.

One hour and I only cleaned up 10 feet of trench. And my body obviously thinks I put it through torture.

Yeah, this is going to be a fun spring while I whoop myself back into shape!

On the bright side, here’s the cuteness I got to spend time with while I shoveled.

This girl loves to play in the dirt. And the messier the better.

So tomorrow, I challenge myself to spend two hours on that trench, ’cause there’s only another 30 feet to go!

Oy.

Homestead Update: still waiting, but being productive

I didn’t realize it had been so long since I last did an update on the house progress until I posted about Pajii’s new garden beds and saw the half-sided house in the background.

So yeah, this picture was taken on January 26th. We haven’t seen our contractor since that day. Our house sits there, half sided, getting snowed on. We finally gave up on being able to get ahold of him and have found a new contactor to finish the job. They will start as soon as they can fit us into their schedule.

In the mean time, we’ve been keeping pretty busy around the homestead with other projects that needed doing.

We were blessed with unseasonably warm and dry weather for most of January and February.

Picnic lunch in the February sunshine

School outside in February?

We decided to take a Saturday and finish the concrete patio outside our completed well shed (I’m putting together a post on that, I promise). The existing concrete was leftovers from when we poured our house footers. We were hoping we’d have enough left over from the house slab pour, but the calculations on that were perfect. Not short, but no leftovers either. So we had to go buy bags of concrete to finish the well shed slab job.

Prepping the 4’x7′ section

IT’S ALIVE!!! This concrete mixer was my dad’s and has been sitting on this piece of land, completely unprotected, for at least 12 years. And it still worked!

Concrete work is dirty work.

We mixed 3 bags of concrete at a time in the mixer, then poured it into a bucket to schlep it into place.

It was actually really easy to move the concrete around such a small area with the bucket.

You can see the chicken wire we put down as an added strengthener. Every so often, we’d reach down and pull the wire up so it was floating in the slab rather than pressed down to the ground.

While Hubs mixed up another batch of concrete in the mixer, Pajii and I would scree the freshly poured stuff so it stayed level with our existing slab and the forms we built out of 2×4’s.

The finished slab. It makes getting into the well shed so much easier!

Another project we worked on was some driveway maintenance. We had put in a culvert last fall and it needed a bit of upkeep.

Adding and compacting more dirt over top of the culvert.

Hubby cleaning out some collected sediment inside the culvert.

There were a few gardening type things to do as well. Since I don’t plan to start a garden this year for myself, it was great to get some dirt under my fingernails, so to speak.

Spreading pine needles collected from our church’s landscaping. This area will eventually be our fenced in garden with raised beds, but right now it is a parking area. We thought it best to use decomposable material rather than gravel to combat the mud in this area. Besides, the pine needles were free and we were saving our church some money since they didn’t have to haul it all to the dump.

I had some flower bulbs I needed to get in the ground. So I made a couple new areas for flowers along the pathway going from the upper level down to the house pad.

This area eventually became a perennial flower bed. Once the spring bulbs come up, we’ll plant some more summer type perennials in this bed, too.

And, since I had gone a little crazy buying flower bulbs last fall, we had plenty left over to plant in other places as well, such as around our cherry trees.

Oh, and we finally finished the stairway that leads from the upper level down to the house pad.

These stairs are made from railroad ties that have been sitting on this property for over a decade.

And, if you’ll remember the panels that blew off the side of the hill?

We finally got them back up to the pad. All 29 of them.

Even Flower Girl was able to help once the panels were at the top of the hill. The panels are heavy for a 5 year old, but she’s strong and has a will to help.

This girl, even with a gimpy knee, was amazing in getting all those panels back to the top.

So even though we haven’t been able to work on the house, we have not been idle this winter. January and February we’re filled with a lot of time outside.

And then March blew in and winter finally settled in.

So, we’re back to being stuck inside and working on other projects.

But Spring is just around the corner. And our new contractor said it shouldn’t take much more than a week to finish the siding and roofing once they get started. Rest assured we’ll be shouting from the mountainside when that blessed event finally happens.

In the meantime, keep warm and busy friends.